Votre projet

A Three Step Project

Setting up the ERibox system is simple and quick and usually requires little to no red tape (saving up to twelve months on the project).

Project 2014Your project in 3 steps (PDF)

1- First Contact and Preliminary Study of the Project

  • Investigate your operations: to search optimum between biogas production and valorization
  • Pre-dimensionning the project

Design

The ERigene team explores with you the best options to implement and install the ERibox system in your premices.

2-Feasibility Study

  • Laboratory analysis: BioMethane Potential tests (BMP) *
  • Technical/biological studies of the project

Feasibility Study

  • Dimensionning
  • Technical & Economical
  • Electrical & Environmental

* If the BMP proves insufficient to , only the methane potential Test is invoiced.

3- On Site Implementation

  • Delivery and Installation
  • Commissioning
  • On-site Training
  • Technical and biological Support

Installation


Conveying the digesters and control module.


Setting up the control module.



Remove the digestion modules.


Connecting the digesters to the control module.



Loading a digester module

Performance Monitoring and Maintenance

Thanks to the control module, digestion performance and biogas production are monitored remotely by ERigene via the internet, allowing to adjust the some parameters to seasonal or material variations.